How to Choose a Healthcare Architecture Firm in Cork (Without Relying on a National League Table)
The first thing a live hospital teaches you is that it has no particular interest in your construction programme. At University Hospital Limerick , new ward accommodation had to be built in an enclosed courtyard between the Emergency and Paediatric Departments. There was no normal physical access to the site. The answer involved a light-gauge steel prefabricated system, with panels lifted by crane over the existing hospital buildings and carefully slotted into place. That sounds neat when you put it into one sentence. It was not neat. Every decision about access, lifting, noise, separation and sequencing had to sit around a hospital that was still doing what hospitals do: admitting patients, moving beds, running clinical services and dealing with whatever the day brought. Ask anyone who has project-managed a live hospital extension and they will tell you much the same thing. It is a little like renovating the kitchen while the family still expects three meals a day out of it — except ...